Planningvia Powys Council Planning
Installation of two air source heat pumps (ASHP) and battery energy storage system (BESS) together with associated works
Installation of two air source heat pumps (ASHP) and battery energy storage system (BESS) together with associated works
Installation of two air source heat pumps (ASHP) and battery energy storage system (BESS) together with associated works
Address: UNIT 2, DYFI ECO PARK, MACHYNLLETH, SY20 8AX
Ref: P/26/1243/FUL
Type: Full planning permission
Status: Under Consultation
Ward: Machynlleth

Comments
No comments yet. Be the first to share your thoughts!